Services | Oasis Engineering & Supplies
Services

Modular. No compromise.

Take one service or combine several. Every part of the Oasis programme is available on its own, with the same engineers, chemistry and reporting.

FIG. 00 · how services are supplied
Services6, each available on its own PricingQuoted per site, after readings TeamOasis in-house technicians ReportingWritten report on every job
01 — À la carte services

Six services. Each one complete on its own.

Each block lists what we do, what we measure and what you get back. Request one or several.

Chemical dosed by hand into a cooling tower, with a manual bleed-off valve
FIG. 01 · chemical feed
manual dosing · manual bleed-off

Chemical Dosing Service

When the chemistry isn't matched to your water, scale, corrosion and biological growth build up between visits.

What's included
  • —Analysis of make-up and recirculating water
  • —Supply of scale and corrosion inhibitor and biocides
  • —Monthly site visit with on-site testing
  • —Written service report after every visit
Specification
SystemsCooling towers, chillers, closed loops, boilers VisitsOn request
ReportingWritten report each visit
Good fit ifYou already have dosing equipment and need a reliable chemical supply and testing programme.
Dosing skid with chemical tanks, metering pumps and injection point
FIG. 02 · dosing skid
tanks · pumps · injection

Automated Dosing System

Manual and timer dosing can't follow the load, so the system is over-fed one week and under-fed the next.

What's included
  • —Dosing pumps and skid, built by our own team
  • —Chemical tanks and injection points
  • —Installation and commissioning
  • —Operator handover on site
Specification
ControlProportional / timer / controller-linked BuildIn-house skid fabrication IntegrationBMS-ready signals on request
Good fit ifYou're dosing by hand or your existing pumps are unreliable.
Conductivity probe and controller driving the bleed-off valve and metering pumps
FIG. 03 · conductivity controller
probe → setpoint → bleed-off
03 · ControlRecommendedPart of the Oasis programme →

Conductivity Controller & Auto Bleed-off

Bleeding by habit wastes water. Bleeding too little lets dissolved solids climb until they scale.

What's included
  • —Conductivity sensor and controller
  • —Motorised or solenoid bleed valve
  • —Setpoint based on your water analysis
  • —Calibration and commissioning
Specification
MeasuresConductivity (µS/cm) OutputAuto bleed-off + dosing interlock ResultHigher cycles, less make-up water
Good fit ifYou have no chemical dosing system or yours needs an upgrade.
Side-stream filter cutaway
FIG. 04 · side-stream filter
cutaway · screen + flush valve

Side-stream Filter Installation

Suspended solids settle in condenser tubes and shield bacteria from the biocide.

What's included
  • —Filter sizing to your recirculation rate
  • —Supply and installation
  • —Piping tie-in
  • —Commissioning and DP-triggered auto-flush setup
Specification
Flow5–10% of recirculation rate CleaningAutomatic, differential-pressure triggered IntegrationLinked to dosing controller
Good fit ifYour basin is muddy, your site is dusty or turbidity is high.
Approach temperature rising past the design limit
FIG. 05 · approach temperature

Condenser Loop Flushing Service

Scale, sludge and biofilm build up through the whole condenser loop, not just the tubes. Approach temperature climbs, the compressor works harder and biocide can't reach what's underneath.

What's included
  • —Approach temperature and water readings before and after
  • —One-time chemical flush circulated through the full condenser loop
  • —Biofilm and slime dispersion ahead of the descale
  • —Neutralise, drain and refill to normal treatment levels
  • —Written report with readings
Specification
MethodOne-time chemical circulation flush ScopeCondenser tubes, loop piping, tower basin ProofApproach temp, before and after
Good fit ifApproach temperature is high or the loop has severe microbiological growth or sliming.
Clean fill pack beside a fouled fill pack with biofilm
FIG. 06 · fill pack
after clean · before clean

Cooling Tower Physical Cleaning

Sludge, algae and debris in the basin and fills feed corrosion and raise Legionella risk.

What's included
  • —Drain-down and basin desludging
  • —Fill, drift eliminator and louvre cleaning
  • —Disinfection before refill
  • —Photo report, before and after
Specification
ScopeBasin, fills, eliminators, louvres, strainers FrequencyOn request ReportBefore/after photos
Good fit ifYou can see slime, algae or sludge or a Legionella test came back high.
02 — Build your scope

Tick what you need. Send one request.

We'll reply with one quotation covering everything you ticked and arrange a site visit if the job needs readings first.

03 — Better together

Each service makes the next one work better.

On its own, each service fixes one problem. Run together, they stop it coming back.

{{ l.k }} {{ l.t }}
{{ l.d }}
Six parts · one water programme
See the full programme →

Speak to an engineer.

We sample your make-up and recirculating water, inspect the tower and condenser and return a written treatment proposal.

Book a site survey Message on WhatsApp
HQ
Penang
354-H, Jalan Jelutong, Jelutong, 11600 Jelutong, Pulau Pinang
04-281 2648
Office
Selangor
No. 48, Jalan Bulan U5/167, Seksyen U5, Bandar Pinggiran Subang (Subang 2), 40150 Shah Alam, Selangor
03-7859 7648
Email
General enquiries
Services across Malaysia. Filtration distributorship across Southeast Asia.
info@oasis-eng.com.my