The Oasis System | Cooling Water Treatment Malaysia | Oasis Engineering
System

Six parts. One water programme.

Every Oasis programme is built from the same parts: chemistry, dosing, filtration, chiller flushing, service and software. We specify them for your site and run them as one system.

Explore in 3D Book a site survey
{{ p.n }} {{ p.short }}
Drag to rotate

{{ p.d }}

  • {{ s }}
All case studies
{{ how.n }} · {{ how.t }}

{{ how.h }}

{{ how.d }}

  • {{ pt.k }} {{ pt.v }}
Case study · {{ cs.ind }}{{ cs.scope }}

{{ cs.t }}

{{ cs.d }}

before
3.6 °C
after
0.5 °C
avg condenser approach · 3 chillers
beforeafter
3.2
8
100%
72%
cyclesmake-up water
10³ CFU/mL limit
neg
24 monthly dip-slides · 8 quarterly Legionella tests
Discuss a similar project
{{ cs.m1 }}{{ cs.l1 }}
{{ cs.m2 }}{{ cs.l2 }}
Typical treatment
Oasis programme
{{ r.n }}{{ r.k }}
✕{{ r.a }}
{{ r.b }}
Book a site survey
{{ r.k }} {{ cmpSym }}{{ r.m }}
FIG. A · energy
≈ RM{{ en.rm }} / yearfor every {{ en.dtLabel }}, on one {{ en.rt }} RT chiller

Each 1 °C rise in condensing temperature adds roughly 2–3% to compressor energy. Scale in the condenser tubes is what pushes it up.

Compressor energy only. 2.5% per °C used as midpoint. Enter your own figures.
FIG. B · water · unnecessary blowdown
{{ calc.saveM3 }} m³Water saved per month
RM {{ calc.saveRM }}Saved on water + sewerage per month
{{ calc.pctLine }}

Most towers bleed off more than they need to: timer-based bleeds, valves left cracked open or bleeding ‘to be safe’ when conductivity is already in range. Every litre bled is a litre bought, treated and paid for again as sewerage.

Today
{{ calc.now.eLab }}
{{ calc.now.bLab }}
Buy {{ calc.now.m }} · drain {{ calc.now.b }} m³/day
Control
{{ calc.ctl.eLab }}
{{ calc.ctl.bLab }}
Buy {{ calc.ctl.m }} · drain {{ calc.ctl.b }} m³/day
Evaporation · needed for cooling Bleed · paid for twice
Times water is reused = cycles of concentration. Mass balance at constant evaporation.
FIG. C · tube leaks
RM100k – 250k+when one leaking tube becomes a retube, on a 500 RT chiller
The cost goes beyond the tube.

A leaking condenser tube can let water into the refrigerant circuit, contaminating refrigerant and oil. What starts as one pinhole can end with the whole bundle replaced.

Eddy-current testingRM3,000 – 8,000
Plugging leaking tubesRM300 – 800 per tube
Full condenser retubeRM80,000 – 200,000
Refrigerant recovery & oil changeRM15,000 – 50,000
Chiller downtime1–2 days to plug · 2–4 weeks to retube
Indicative Malaysian ranges for a 500 RT centrifugal chiller. Excludes lost production. Every chiller differs.
FIG. D · hidden costs

What poor treatment actually costs

8 cost lines · one root cause
{{ c.n }}
{{ c.t }}
FIG. E · your site See your own numbers Send us your tower and chiller details and we'll reply with a quotation for your programme.
Request a quotation →
Prefer to message an engineer? Message on WhatsApp
HQ
Penang
354-H, Jalan Jelutong, Jelutong, 11600 Jelutong, Pulau Pinang
04-281 2648
Office
Selangor
No. 48, Jalan Bulan U5/167, Seksyen U5, Bandar Pinggiran Subang (Subang 2), 40150 Shah Alam, Selangor
03-7859 7648
Email
General enquiries
Services across Malaysia. Filtration distributorship across Southeast Asia.
info@oasis-eng.com.my
{{ stepTitle }} {{ stepLabel }}
Equipment on site
{{ err }}
Back {{ nextLabel }}
Request received · 2/2 Thanks, {{ f.name }}. An engineer will call you to arrange the survey.

Have recent chiller readings or a water report to hand? Send them on WhatsApp and we'll review them before the visit.

{{ summary }}