02 — How it works
One loop, three jobs.
A live look at the condenser loop as each part of the programme does its work, from the first dose to the savings on your BMS. Each step is paired with a site where we measured the result.
All case studies COOLING TOWER · SERVICE
CHEMISTRY · INHIBITOR / BIOCIDE
BLEED-OFF · CONDUCTIVITY CONTROL
SIDE-STREAM FILTER
BMS · ENERGY & WATER SAVING
CHILLER · CONDENSER TUBES
Dosing into the tower basin
01 · Treat
Find the root cause. Treat it right.
Every system is different, so we don’t use a one-size-fits-all programme. Our engineers diagnose what’s really happening in your water (scale, corrosion or microbial growth) and design a chemical programme for your system’s load, water quality and operating cycles. Chemical treatment is what we’ve built Oasis on, backed by world-class chemistry and 30 years of dosing experience.
Case study · Hospital
Microbiological control
Microbiological control for rooftop cooling towers
Dual-biocide programme with monthly dip-slide and quarterly laboratory Legionella testing.
10³ CFU/mL limit
neg
neg
neg
neg
neg
neg
neg
neg
24 monthly dip-slides · 8 quarterly Legionella tests
Read the case study 0
Positive Legionella samples, 24 months
< 10³
CFU/mL total bacteria, all visits
03 — Why it matters
The cost of poor treatment is rarely on the invoice.
Chemicals are a small line item. Scale, corrosion and wasted water are where cooling budgets actually leak.
Typical treatment
Oasis programme
01
Chiller energy
✕
Scale and biofilm build up in condenser tubes. Approach temperature creeps up unnoticed.
Approach temperature is tracked, so tubes are flushed before the efficiency loss compounds.
02
Dosing
✕
Chemicals topped up by hand when someone remembers. Some weeks are overdosed, others underdosed.
Automated timer dosing on a metering pump, so inhibitor and biocide go in on schedule between visits.
03
Bleed-off
✕
Opened by hand or on a fixed timer, whatever the water quality.
Conductivity-controlled: water goes to drain only when dissolved solids reach the set point.
04
Water use
✕
Runs at low cycles of concentration “to be safe”, so more water goes to drain.
Runs at higher cycles under controlled bleed-off, so less make-up and less blowdown.
05
Tube life
✕
Pitting and under-deposit corrosion go undetected until a tube leaks.
Corrosion inhibitor levels and coupon results are monitored and reported.
06
When something fails
✕
An emergency call-out, chiller downtime, then plugging or retubing.
Issues are flagged in monthly reports before they become shutdowns.
07
Reporting
✕
A handwritten service sheet, if anything.
Monthly certificate of analysis.
08
Accountability
✕
Separate vendors for chemicals, flushing and BMS.
One team answers for the loop.
Book a site survey Energy
≈ RM 15,000 / year
for every 1 °C , on one 500 RT chiller
Each 1 °C rise in condensing temperature adds roughly 2–3% to compressor energy. Scale in the condenser tubes is what pushes it up.
Compressor energy only. 2.5% per °C used as midpoint. Enter your own figures.
Water · unnecessary blowdown
145 m³
Water saved per month
RM 727
Saved on water + sewerage per month
27% less water sent to drain
Most towers bleed off more than they need to: timer-based bleeds, valves left cracked open or bleeding ‘to be safe’ when conductivity is already in range. Every litre bled is a litre bought, treated and paid for again as sewerage.
Today
100 m³
18
Buy 118 · drain 18 m³/day
Control
100 m³
13
Buy 113 · drain 13 m³/day
Evaporation · needed for cooling
Bleed · paid for twice
Times water is reused = cycles of concentration. Mass balance at constant evaporation.
Tube leaks
RM100k – 250k+
when one leaking tube becomes a retube, on a 500 RT chiller
The cost goes beyond the tube.
A leaking condenser tube can let water into the refrigerant circuit, contaminating refrigerant and oil. What starts as one pinhole can end with the whole bundle replaced.
Eddy-current testing
RM3,000 – 8,000
Plugging leaking tubes
RM300 – 800 per tube
Full condenser retube
RM80,000 – 200,000
Refrigerant recovery & oil change
RM15,000 – 50,000
Chiller downtime
1–2 days to plug · 2–4 weeks to retube
Indicative Malaysian ranges for a 500 RT centrifugal chiller. Excludes lost production. Every chiller differs.
Hidden costs
What poor treatment actually costs
8 cost lines · one root cause
Higher electricity bills
Water and sewerage charges
Emergency call-outs
Chiller downtime
Tube plugging and retubing
Refrigerant contamination
Legionella and compliance risk
Engineer hours spent firefighting
Your site
See your own numbers
Send us your tower and chiller details and we'll reply with a quotation for your programme.
Request a quotation →