Case study · Hotel · Cooling tower programme

Cooling tower programme and bleed-off automation at a hotel.

Manual blowdown was replaced with conductivity-controlled bleed-off and a revised inhibitor programme.

Cooling tower louvres and pipework on a hotel rooftop plant
Cooling tower louvres
Cycles of concentration
3.2 → 8
Reduction in make-up water
28%
01 — The problem

What we found.

The hotel's cooling tower was bled off by hand. Manual blowdown cannot follow the load, so towers are usually bled conservatively, running at low cycles of concentration and sending treated water to drain that could have been reused. The tower ran at 3.2 cycles.

02 — The work

What we did.

  • Manual blowdown replaced with a conductivity controller and automatic bleed valve
  • Setpoint based on the site's water analysis
  • Inhibitor programme revised to run safely at higher cycles
  • Monthly testing and written reports to confirm control
03 — The result

Measured before and after.

3.2 → 8Cycles of concentration
28%Reduction in make-up water

Cycles of concentration rose from 3.2 to 8 and make-up water fell by 28%. Less make-up also means less treated water and chemical sent to drain.

Client name withheld. Figures measured on site and reported to the client.

Speak to an engineer.

We sample your make-up and recirculating water, inspect the tower and condenser and return a written treatment proposal.

HQ
Penang
354-H, Jalan Jelutong, Jelutong, 11600 Jelutong, Pulau Pinang
04-281 2648
Office
Selangor
No. 48, Jalan Bulan U5/167, Seksyen U5, Bandar Pinggiran Subang (Subang 2), 40150 Shah Alam, Selangor
03-7859 7648
Email
General enquiries
Services across Malaysia. Filtration distributorship across Southeast Asia.
info@oasis-eng.com.my